Front | Back |
The Scope Statement
should contain which of the following?
A. Project schedule B. Project budget constraints C. Summary of project tasks , deliverables and resources required D. Project objectives |
D. Project objectives
|
The Scope Management
Plan is included in which of the following documents.
A. Project Plan B. The Work Breakdown Structure C. The Scope Statement D. Project Specifications |
C. The Scope Statement
|
Project Scope:
A. is of concern only at the start of the project B. is mainly a problem to be handled by the change control procedures during the project execution phase. C. Should be managed and controlled from the project concept through close-out D. is usually not a problem after the contract or other document authorizing the project has been approved. |
C. Should be managed and controlled from the project concept through close-out
|
The Project charter is
created by:
A. The project manager B. Upper management C. The Vice President over a functional management group D. The customer |
B. Upper management
|
The project scope
statement furnishes the basis for:
A. The project scope statement furnishes the basis for B. Provides links to the clients functional management groups C. Allowing the project to move to the next phase D. A way to provide updated information to the accounting department |
A. The project scope statement furnishes the basis for
|
The Scope Baseline is:
A. the original description of the project's end results B. a summary description of the project's original content and end product, including basic budgetary and time constraint data C. the original project budget and schedule D. a and c |
B. a summary description of the project's original content and end product, including basic budgetary and time constraint data
|
A Project control
system:
A. Monitors and controls the project's schedule, costs, scope, budgets etc B. Is a mechanism which reacts to the current project status in order to endure accomplishment of project objectives C. Is only needed on large mega projects D. Is a system for controlling and executing project documentation in an uniform and timely manner |
A. Monitors and controls the project's schedule, costs, scope, budgets etc
|
The PM distributed a
document to the stakeholders, which described the software to be developed, the
functionality, the users it would serve and the installation timeline. The
document was an example of:
A. Product scope B. Project scope C. A combination of project and product scope D. It was not complete enough to be either a product or a project scope document |
D. It was not complete enough to be either a product or a project scope document
|
Each item of the Work
Breakdown Structure is assigned a unique identifier. What is the name of this
identifier?
A. Product ID number B. Code of accounts C. Quality inspection identifier D. Project activity code |
B. Code of accounts
|
When developing a
project's scope statement, which of the following should not be included?
A. Project justification. B. Cost/benefit analysis C. Project deliverables D. Measurable objectives |
A. Project justification.
|