Front | Back |
Which of the following describes the technique of poka-yoke (mistake proofing)?
|
An airline pilot reviews a pre-flight checklist to make sure everything is
ready for takeoff.
|
Justin Thyme used to run one batch each of 500 As, 300Bs and 100Cs every month but now he runs a
batch of 5As, 3Bs, and 1C every half day:
|
now that he embraces mixed-model assembly
|
In lean systems, if a defective product is found, which of the following is generallyNOT done?
|
The defective unit is passed on to the next workstation. 82.609%
|
In lean systems, if a defective product is found, which of the following is generally done?
|
The production line is stopped. 13.043%
The defective unit is passed on to the next workstation. 82.609%
The defective unit is returned to the worker responsible for creating the
defect. 1.449%
The production line is made aware of the problem without stopping the line.
|
If the inventory advantages of a lean system are to be realized, small lot sizes must be used; in order
to use small lot sizes, manufacturers must significantly reduce setup times because:
|
Reduced setup time makes small lot sizes economical.
|
Demand scheduling is a type of scheduling that:
|
assigns customers to a specific time for order fulfillment
|
A _____________________ specifies the sequence in which jobs or activities should be processed.
|
dispatch list
|
The time from when a job enters a workstation to when it is finished is called
|
flowtime
|
A job with a critical ratio of 1.2 is
|
ahead of schedule
|
Characteristics of lean systems
|
Pull method of work flow, quality at the source, small lot sizes, uniform workstation loads, standardized components& work methods, close supplier ties, fleixble workforce, preventive maintenance, line flows, automation five S.
|
A companywide process that cuts across traditional functional areas, business units, geographic
regions, and product lines is a(n):
|
enterprise process.
|
Which one of the following statements concerning MRP is true?
|
MRP is appropriate for use in environments with many BOM levels and an
assemble-to-order strategy
|
The time-phased plan specifying when and how many end items are to be built is known as the:
|
master production schedule
|
Any item manufactured from one or more components is a(n):
|
Parent
|
Which best defines the gross requirements for a component item?
|
the total demand for the component derived from all immediate parents
|