ISE 2214- SB-A

Manufacturing Process Lab

11 cards   |   Total Attempts: 188
  

Related Topics

Cards In This Set

Front Back
SB-A

A SWITCH BOX

A SIMPLE ELECTRICAL COMPONENT PRODUCED FROM VARIOUS ITEMS
SB-A

ASSEMBLY LINE
A SET OF STATIONS, ARRANGED IN A LINE, WHERE EACH STATION IS RESPONSIBLE FOR PERFORMING A DIFFERENCE SET OF TASKS NEEDED TO PRODUCE THE ITEM
SB-A

MAXIMUM THRUPUT, λ
THROUGHPUT MEASURED IN PARTS PER HOUR
SB-A
MINIMIIZE % REJECT, R
IF λ= 10 PPH AND R=.20 THERE ARE ONLY 8 GOOD ITEMS COMING OFF THE LINE IN 1 ONE
SB-A
MINIMIZE WORK IN PROGRESS, WIP
THIS IS THE AVERAGE # OF PARTS ON THE ASSEMBLY LINE AT ANY GIVEN TIME
SB-A
PACED LINE
EACH STATION IS ALLOTED EXACTLY THE SAME AMOUNT OF TIME TO PERFORM ITS ASSIGNEED TAK
SB-A
CYCLE TIME
THE AMOUNT OF TIME IT TAKES EACH LINE TO PERFORM IT'S ASSIGNED TASK
SB-A UNPACED LINES
COMPLETED ITEMS ARE IMMEDIATELY MOVED FROM ONE STATION TO ANOTHER
SB-A BUFFER QUEUES
SOME SPACE BETWEEN TWO STATIONS WHERE COMPLETED ITEMS CAN BE STORED TEMPORATILY
SB-A STARVED STATION
COMPLTED ITEM CANNON BE MOVED BECAUSE THE FOLLOWING BUFFER IS FULL
SB-A BLOCKED STATION
COMPLETED ITEMS IS MOVED BUT NO ITEMS TO WORK ON BECAUSE THE PRECEDING BUFFER.