Front | Back |
SB-A
A SWITCH BOX |
A SIMPLE ELECTRICAL COMPONENT PRODUCED FROM VARIOUS ITEMS
|
SB-A
ASSEMBLY LINE |
A SET OF STATIONS, ARRANGED IN A LINE, WHERE EACH STATION IS RESPONSIBLE FOR PERFORMING A DIFFERENCE SET OF TASKS NEEDED TO PRODUCE THE ITEM
|
SB-A
MAXIMUM THRUPUT, λ |
THROUGHPUT MEASURED IN PARTS PER HOUR
|
SB-A
MINIMIIZE % REJECT, R |
IF λ= 10 PPH AND R=.20 THERE ARE ONLY 8 GOOD ITEMS COMING OFF THE LINE IN 1 ONE
|
SB-A
MINIMIZE WORK IN PROGRESS, WIP |
THIS IS THE AVERAGE # OF PARTS ON THE ASSEMBLY LINE AT ANY GIVEN TIME
|
SB-A
PACED LINE |
EACH STATION IS ALLOTED EXACTLY THE SAME AMOUNT OF TIME TO PERFORM ITS ASSIGNEED TAK
|
SB-A
CYCLE TIME |
THE AMOUNT OF TIME IT TAKES EACH LINE TO PERFORM IT'S ASSIGNED TASK
|
SB-A UNPACED LINES
|
COMPLETED ITEMS ARE IMMEDIATELY MOVED FROM ONE STATION TO ANOTHER
|
SB-A BUFFER QUEUES
|
SOME SPACE BETWEEN TWO STATIONS WHERE COMPLETED ITEMS CAN BE STORED TEMPORATILY
|
SB-A STARVED STATION
|
COMPLTED ITEM CANNON BE MOVED BECAUSE THE FOLLOWING BUFFER IS FULL
|
SB-A BLOCKED STATION
|
COMPLETED ITEMS IS MOVED BUT NO ITEMS TO WORK ON BECAUSE THE PRECEDING BUFFER.
|