Front | Back |
Temporary Protection (LS)
|
1,000.00
|
Dumpster (EA)
|
350.00
|
Union - Walls/doors/millwork (MD)
|
800.00
|
Non-union - Walls/doors/millwork (MD)
|
450.00
|
Remove door/frame/hardware (EA)
|
35.00
|
Remove masonry walls (SF)
|
3.00
|
Cut opening in drywall partitions (EA)
|
50.00
|
Furniture Removal (check w/ furniture vendors) (MD)
|
800.00
|
Union - Carpet or Vinyl Flooring (includes vinyl base removal) (SF)
|
0.65
|
Union - Ceramic Tile flooring (SF)
|
1.00
|
Non-union - Carpet or Vinyl Flooring (includes vinyl base removal) (SF)
|
0.45
|
Non-union - Ceramic Tile flooring (SF)
|
0.75
|
Remove Raised Flooring System (SF)
|
0.80
|
Union - Remove acoustical ceiling - tile and grid (SF)
|
0.65
|
Union - Remove acoustical ceiling tile only - grid to remain (SF)
|
0.35
|