Front | Back |
WHO IS THE REPAIR OFFICER?
|
CDR KALOWSKY
|
WHO IS THE PMA (PRODUCTION
MANGMNT ASSISTANT)?
|
LCDR SCHMIDT
|
WHO IS THE REPAIR MASTER CHIEF (RMC)?
|
EMCM CROWLEY
|
WHAT IS THE MISSION OF REPAIR DEPT?
|
PROVIDE REPAIR SERVICES TO SHIPS AND SUBS OF PACIFIC FLT.
|
WHAT IS THE PURPOSE OF QA?
|
ENSURE ALL SPECs ARE MET ALL TIMES, PROPER PROCEDURES ARE BEING FOLLOWED AND SUPERVISED
|
WHAT IS THE FUNDAMENTAL RULE OF QA?
|
ALL TECHNICAL SPECs ARE MET AT ALL TIMES
|
DEFINE THE ACRONYMS FWP AND CWP...
|
FWP- FORMAL WORK PROCEDURE
CWP- CONTROLLED WORK PROCEDURE
|
WHAT IS THE DIFFERENCE BETWEEN FWP AND CWP?
|
-CWP IS OBJECTIONAL QUALITY EVIDENCE (OQE)
-FWP USES MANUFACTURES DRAWINGS AND TECH MANUALS AND MRC TO DO JOB
|
WHAT IS THE BASIC QUALs REQd BY ALL REPAIR PERSONNEL?
|
3M 301 CRAFTSMAN
|
WHAT STARTED THE SUBSAFE PROGRAM?
|
SINKING OF THE USS THRESHER
|
WHAT IS THE ACRONYM AWR?
|
AUTOMATED WORK REQUEST
|
HOW IS AN AWR (AUTOMATED WORK REQUEST) PROCESSED?
|
FROM REPAIR DEPT TO SHIPS SUP TO PLANNING BACK TO SHIP SUP FOR DISTRIBUTION TO LEAD WORK CENTER. WHEN COMPLETED IT IS SIGNED BY DIVO AND GIVEN TO ARRS TO CLOSE ACCOUNT
|
HOW MANY REPAIR DIVs ARE THERE?
|
8 TOTAL REPAIR DIVs
R0, R1, R2, R4, R5, R6, R7, R8
|
WHAT IS THE FUNCTION OF R0 DIV AND WHO IS THE DIVO?
|
-R0= REPAIR ADMIN; ARRS, TRNG, PRINT-PHOTO-DRAFTING SHOP
-ENCM MALABRIO
|
WHAT IS THE FUNCTION OF R1 DIV AND WHO IS THE DIVO?
|
-R1= HULL REPAIR; SHEET METAL, WELD-PIPE-LAGGING-CARPENTRY SHOPS
-LTJG MCNEIL
|