Front | Back |
Process of determining requirements and devising methods of actions to construct a project is called?
|
PLANNING
|
Determining the amount of materials, labor and equipment for a project is part of which process?
|
ESTIMATING
|
After materials for a project have been converted to a quantity and cost, what allowances should you add to the total for a complete material estimate?
|
MATERIAL WASTE AND LOSS OF FIGURES
|
What type of estimate must be completed before accurate estimates for manpower requirements are made?
|
EQUIPMENT
|
What estimate can be made using the individual activity quantities take from a task description?
|
MANPOWER / LABOR ESTIMATE
|
A typical written statement will include the PROJECT _____?
|
MATERIALS, EQUIPMENT, MANPOWER AND COSTS
|
Which type of maintenance is used to prevent equipment and system failure?
|
PREVENTIVE
|
What is indicated by the FIRST component of the serial number of an MPC card?
|
SYSTEM A SPECIFIC MAINTENANCE PROCEDURE BELONGS TO
|
What database system allows you to manage personnel rating information required for performing maintenance procedures?
|
CMPLUS
|
Which CMplus option is used to identify maintenance and unit operations due within a specific timeframe?
|
MAINTENANCE SCHEDULER OPTION
|
Maintenance History Reports can be selected, sorted and printed by?
|
WORK CENTER, MAINTENANCE PROCEDURES, ALL UNIT MAINTENANCE, AND CI
|
Where can you locate detailed supply and technical information on unit equipment attached to a unit?
|
MICA
|
Where can you find detailed information on FLIS parts?
|
FEDLOG
|
Once an initial part or request has been approved in the CMplus Order option, what submenu should you use to order materials?
|
MILSTRIP REQUISITIONS OR COMMERCIAL PURCHASE REQUISITIONS
|
What type of pneumatic nailer holds a row of nails in a spring-loaded magazine?
|
STRIP-FED
|