Front | Back |
Which Air Force Specialty Code (AFSC) requires members to pass the Air Force Electronic Data Processing Test?
|
A. Computer Systems Programming.
|
Which of the following is not a mandatory requirement for the advancement to the 7-skill level?
|
D. Completion of Air Education and Training Command (AETC) Supplemental training courses.
|
Which of the following functions is primarily staffed by Client Systems personnel but may have a variety of Air Force Specialty Codes (AFSCs) based upon the unit mission?
|
A. Communications Focal Point.
|
What document directs the Communications Focal point key processes?
|
B. MPTO 00–33A–1001–WA.
|
Where is the Air Force active component manpower planning and programming centralized
|
B. at Headquarters Air Force (HAF).
|
Which of the following is the official source of manpower information for an organization and is used as a tool to manage positions?
|
B. Unit Manpower Document (UMD).
|
Which of the following is a subdivision of programmed cost data related to a weapon system or support function?
|
A. Program Element Code (PEC).
|
Which of the following is not a responsibility of the Air Force Career Field Manager (AFCFM)?
|
D. Distribute personnel throughout their respective major command (MAJCOM).
|
Who serves as the major command (MAJCOM) voting representative during career field Specialty Training Requirements Team (STRT) and Utilization and Training Workshop (U&TW)?
|
B. MAJCOM Functional Manager.
|
Which segment of the Utilization and Training Workshop (U&TW)/ Specialty Training Requirements Team (STRT) process concentrates on training proficiency levels and training resourcing?
|
B. Segment 2.
|
Which of the following is not an action of the Specialty Training Requirements Team (STRT)?
|
D. Finalize Specialty Training Standards (STS)/Course Training Standards (CTS) for all courses.
|
Which of the following is an optional attendee for the Utilization and Training Workshop (U&TW)?
|
B. AETC Career Development Course (CD)C writer.
|
What is used as a starting point to develop the Career Field Education and Training Plan (CFETP) and Specialty Training Standard (STS) during the Specialty Training Requirements Team (STRT) and Utilization and Training Workshop (U&TW)?
|
A. Occupational Analysis Report (OAR).
|
14. (004) What Automated Information System (AIS) is used to document actions on any item with an assigned Standard Reporting Designator (SRD)?
|
D. Integrated Maintenance Data System (IMDS).
|
15. (004) Which of the following is not a common duty of the Maintenance Data Collection (MDC) monitor?
|
B. Ensures equipment status is entered into Equipment Status Reporting (ESR).
|