Front | Back |
Document A201 - General Conditions of the Contract for Construction is comprised of how many articles?
|
15
|
True or False:
Document A-201 - General Conditions of the Contract for Construction is not a contract, but part of a contract. |
True
|
The Architect assists in the preperation of the General Conditions of the Contract for Construction. What information will not be included in this document until after the contract has been awarded and signed.
|
Contractor
|
The B201- General Conditions of the Contract for Construction is consistent with two other documents. What are they?
|
|
True or False:
A201-General Conditions of the Contract for Construction was the first document produced by the AIA. |
True
|
What two documents define what the Contract Documents consist of?
|
|
What article of the B201 discusses the work, project, drawings, specifications instruments of service and the Initial Decision maker?
|
Article 1 - General Provisions
|
What article in the B201 indicates that the contract documents are complementary.
|
Article 1
|
What article in the B201 - General Conditions of the Contract for Construction discuss transmission of data in digital form?
|
Article 1
|
Information and services required by the owner can be found in what article of the B201?
|
Article 2 - Owner
|
What does article 3 in the B201 discuss?
|
The contractor
|
What article in the B201 - General Conditions of the Contract for Construction gives sole responsibility for means and methods to the contractor?
|
Article 3 - The Contractor
|
Jobsite Safety is the sole responsibility of the contractor and is expressed in what part of the B201 - General Conditions of the Contract for Construction?
|
Article 3 - The Contractor
|
True or False:
Rebar is considered means and methods. |
False - If product to remain forever it is not M&M
|
True or False:
Scaffolding is means and method. |
True
|